Artificial Lift Solution Background Image

How to Achieve Stable and Efficient Lifting Methods

Challenges

Rethink Within Limited Tubing Space:

How to achieve long-term and effective pump efficiency optimization?
How to enhance the pump's adaptability to different viscosity crude oils?
How to effectively mitigate issues caused by sand sticking and steam injection scale sticking?
How to maintain the rod and tubing in a rod pump system at the lowest wear state under high deviation angles?

These challenges affect oil lifting efficiency, and the improvement of oil lifting equipment is limited by the confined space within the tubing. The innovation threshold is high, but addressing these issues is urgent.

≤3

Traditional equipment used for heavy to ultra-heavy oil extraction typically has a core pump lifespan of no more than 3 years.

≤20,000

Currently, even the most advanced traditional equipment for heavy oil applications can lift fluids with viscosities no higher than 20,000 mPa·s.

*8

Traditional equipment experiences a peak torque up to 8 times the normal operating torque during initial startup, posing a high risk for conventional screw pumps and similar equipment.

Overview

Efficient, Reliable, and Integrated Artificial Lift Solutions

HXBS provides efficient, reliable, and integrated artificial lift solution combinations that have the ability to overcome various technical challenges and help oilfields achieve their business goals. Our experienced engineering team can provide you with the best artificial lift solutions throughout the life cycle of the well, exceeding expectations in delivering optimal performance, cost reduction, and meeting your expected productivity.

We offer cutting-edge artificial lift products and services

Tapered Progressive Cavity Pump System (IntelliCPCP®)

Power and Control Systems

Monitoring and Automation Services

We have developed and manufactured reliable systems suitable for almost any environment

In extreme environments, the overall equipment maintains production throughout the well's life cycle with minimal operating costs. Our experts will provide a wide range of artificial lift solutions to help you customize HXBS's exclusive artificial lift solution.

From downhole installation and surface deployment services to monitoring and automation, our systems are designed to operate reliably and efficiently — working together to create continuous value for you.

As a company focused on R&D, design, and manufacturing, HXBS possesses core knowledge of every major component, ensuring all parts work together seamlessly and efficiently.

0.5yr

Avg. Payback Period

5~10yr

Pump Inspection Cycle

Risk Reduction

Mechanical-electrical integrated control effectively reduces system risks and maintenance needs

Expert Support

Full-cycle support for customization, installation, and O&M

In the field of ultra-heavy oil lifting, we are leaders in solving production challenges under extreme conditions.

Intelligent Conical Progressive Cavity Pump System

Optimize Production Across Complex Well Conditions

The IntelliCPCP® ground drive system for complex oil quality helps you achieve higher production safely and steadily from the reservoir.

Learn More

Case Studies

More Case Studies

Implemented Oilfield Lifting Case Studies

The optimal solution for harsh well conditions within 2000 meters of well depth

Artificial Lift Case Study case study image

Artificial Lift Case Study

Steam Huff & Puff Cost Reduction for Low-Production Wells at Henan Oilfield

Artificial Lift Case Study case study image

Artificial Lift Case Study

Batch Deployment in Xinjiang Ultra-Heavy Oil High-Deviation Wells